Benchmarks · 2026

2026 U.S. commercial fit-out cost & architectural fee benchmarks

The reference tables behind our test fits and budgets: office fit-out tiers, sector build-out and soft costs, shell delivery conditions with typical TI allowances, and the infrastructure items that break budgets.

Table 1 — U.S. office fit-out cost by workplace type and specification ($/SF)

Workplace typeBaselineMediumHighMarket range
Open & agile (progressive)$255$275$310$170 – $380
High spatial variety (mixed open & private)$275$295$340$180 – $405
Structured / traditional (mostly enclosed)$285$310$355$190 – $425

Source: JLL 2026 U.S. & Canada Office Fit-Out Cost Guide. National medium-quality average ≈ $295/SF. Mechanical & electrical = 29–37% of cost; builders’ works ≈ 29%; furniture, AV, technology & security ≈ 10–12%.

Table 2 — Multi-sector commercial TI build-out and soft-cost schedule

SectorHard cost ($/SF)A&E fee (% of hard cost)A&E fee ($/SF)Municipal permit ($/SF)
Office / workplace$170 – $425 (≈ $295 medium)8% – 11%$8 – $12$1.50 – $5.00
Retail / showroom$100 – $225 (refresh $50 – $100)8% – 10%$8 – $12$1.50 – $5.00
Medical / dental clinic$150 – $350+ (specialty $500 – $750)11% – 15%$18 – $30+$1.50 – $5.00
Restaurant / food service$175 – $700+ (casual $200 – $450)11% – 15%$18 – $30+$1.50 – $5.00

Source: JLL 2026 U.S. & Canada Office Fit-Out Cost Guide (office); Meade Design compilation of 2025–2026 U.S. contractor, CRE broker and fit-out cost reports (retail, medical, restaurant). Permit fees derive from ICC Building Valuation Data or contractor valuation and run highest in Tier-1 metros.

Table 3 — Shell delivery condition: tenant construction cost and typical landlord TI allowance

Delivery conditionTenant construction ($/SF)Typical TI allowance ($/SF)Key architectural / MEP risk
Cold dark shell (gray shell)$60 – $150+ standard · $200 – $350+ medical / restaurant$30 – $60+No interior HVAC or ducting ($15 – $30/SF), no electrical distribution ($10 – $20/SF), no restrooms, slab trenching for plumbing
Warm vanilla shell (white box)$35 – $90$10 – $30Base HVAC, lighting grid, perimeter drywall and a base restroom exist; custom partitions and MEP changes still add up
Second-generation — cosmetic$5 – $10$10 – $25Fastest opening and lowest capital, if the existing layout genuinely fits
Second-generation — reconfiguration$25 – $70$10 – $25Layout mismatches require demolition and trigger ADA and code audits

Source: Meade Design compilation of 2025–2026 U.S. contractor, CRE broker and fit-out cost reports. Construction-only ranges for light-to-standard finish programs; exclude furniture, technology and specialty MEP.

Table 4 — Major MEP, code and design line items

Line itemInstalled costGoverning reference
Type I kitchen exhaust hood + make-up air$20,000 – $55,000+ (≈ $4,000 – $5,000 per linear foot)NFPA 96 · IMC § 507
Wet-chemical fire suppression$3,000 – $8,000IBC § 904
Grease interceptor — indoor hydromechanical$1,000 – $3,500IPC § 1003
Grease interceptor — automatic removal unit (AGRU)$4,000 – $8,000+IPC § 1003
Grease interceptor — in-ground gravity vault$5,000 – $15,000+IPC § 1003
ADA restroom — single, build or remodel$15,000 – $45,000+2010 ADA Standards § 213, § 603
ADA restroom core — new dual / multi-stall with trenching$30,000 – $90,000+2010 ADA Standards § 213
Pre-lease test fit$0.12 – $0.25/SF or $1,500 – $5,000 flat · 5 – 10 business daysLOI test-fit allowance
Construction contingency10% – 15% of hard costOwner budget practice

Source: Meade Design compilation of 2025–2026 U.S. contractor, CRE broker and fit-out cost reports.

Reading the tables

What these numbers include — and what they don’t

  • Tables 1 and 2 are full fit-out costs from a shell-and-core starting point, including furniture, AV, technology and security allowances. They are what a tenant’s total build-out costs per square foot.
  • Table 3 is tenant construction only for light-to-standard finish programs, by delivery condition. Use it to compare suites; use Tables 1–2 to budget a full move-in.
  • Regional spread is large. Tier-1 metros (New York, San Francisco, Boston, Los Angeles) typically run about 25% above growth markets such as Dallas, Austin, Denver and Atlanta; Midwest and Southeast regional markets run about 12% below.
  • Soft costs come on top. Design fees (8%–15%), permits ($1.50–$5.00/SF), test fits ($0.12–$0.25/SF) and a 10%–15% contingency are not inside the hard-cost ranges.
  • Allowances are quoted on RSF in most office leases; construction happens in USF. Convert before comparing — see the shell-conditions comparison.

Primary sources: JLL, 2026 U.S. & Canada Office Fit-Out Cost Guide; International Code Council, IBC and IEBC; U.S. Department of Justice, 2010 ADA Standards and 28 CFR § 36.403; NFPA 96; ANSI/BOMA Z65.1. Non-office ranges are a Meade Design compilation of 2025–2026 U.S. contractor, broker and fit-out cost reports. Licensed CC BY 4.0 — cite “Meade Design, 2026 U.S. Commercial Fit-Out Benchmarks”. Methodology on the studio page.