Tool · CO-1
Change-of-occupancy & ADA trigger checker
Compare the suite’s approved use with what you plan to open, and see the IBC, plumbing, kitchen-exhaust and ADA consequences before the lease is executed.
References: IBC Table 1004.5, Table 1006.2.1, § 903.2.1.2, § 903.2.7, § 904, Table 2902.1; IEBC Ch. 10; IMC § 507; NFPA 96; 2010 ADA Standards and 28 CFR § 36.403(f)–(g). Screening only — local amendments and the building official govern.
What the checker tests
| Check | Rule applied | Reference |
|---|---|---|
| Occupant load | B office 150 SF gross · B outpatient 100 SF gross · M 30 SF gross · A-2 tables and chairs 15 SF net · A-2 standing 5 SF net | IBC Table 1004.5 |
| Exits | Two exits at 50 or more occupants; panic hardware on assembly egress doors at 50+ | IBC Table 1006.2.1 IBC § 1010.2.9 |
| A-2 sprinklers | Fire area over 5,000 SF, 100+ occupants, or not on the level of exit discharge | IBC § 903.2.1.2 |
| Kitchen exhaust | Grease-producing appliances need a Type I hood, grease duct and wet-chemical suppression | IBC § 904 NFPA 96 |
| Plumbing fixtures | Restaurants 1 WC per 75 per sex; bars 1 per 40; business 1 per 25 then 1 per 50; mercantile 1 per 500 | IBC Table 2902.1 |
| ADA path of travel | Up to 20% of the primary-function alteration cost, spent in statutory priority order | 28 CFR § 36.403(f)–(g) |
Screening only: jurisdictions adopt different IBC editions with local amendments, and the building official has the final word. For a sealed code analysis, see code & change-of-occupancy reviews, or price the build-out in the TI budget calculator.