Services

Permit sets & construction documents

A coordinated architectural and MEP set that a plan checker can approve and a contractor can price without guessing — sealed by the state-licensed Architect of Record and engineers for your jurisdiction.

Dimensioned architectural plan sheets with room outlines and annotations

The commercial TI permit set, sheet by sheet

Sheet numbering follows the U.S. National CAD Standard. A typical 3,000–10,000 SF tenant improvement runs 15–30 sheets; restaurants and clinics run longer because of plumbing, exhaust and medical-gas coordination.

  • G / A000
    Code & life-safety summary

    Occupancy classification, construction type, occupant load calculation, egress plan with exit widths and travel distance, plumbing fixture count and accessibility notes.

  • AD101
    Demolition plan

    Existing walls, ceilings, doors and finishes to be removed or protected — the sheet that sets the second-generation scope.

  • A101
    Partition & floor plan

    Wall types, dimensions, door tags, rated assemblies and demising walls.

  • A102
    Furniture & equipment plan

    Workstations, casework, kitchen or medical equipment with utility requirements.

  • A201
    Reflected ceiling plan

    Ceiling types and heights, lighting, diffusers, sprinkler heads and access panels.

  • A401
    Door, hardware & finish schedules

    Door types, fire ratings, hardware sets (including panic hardware where required), and room-by-room finishes.

  • A501
    Interior elevations & details

    Millwork, restroom elevations with ADA mounting heights, wall sections and partition-head details.

  • M / P
    Mechanical & plumbing

    HVAC zoning, ductwork, exhaust and make-up air; plumbing fixtures, waste and vent, grease interceptor and riser diagrams.

  • E
    Electrical

    Power and data, lighting with ASHRAE 90.1 / IECC compliance, panel schedules and load calculations.

  • FP
    Fire protection

    Sprinkler head layout and fire-alarm modifications, usually delegated-design by the fire-protection contractor.

Design fees and AIA phase billing

Architectural and MEP engineering fees for tenant improvements typically run 8%–15% of hard construction cost — about $8–$12/SF for standard office and retail and $18–$30+/SF for MEP-heavy medical, dental and restaurant work. Fees are billed by phase:

PhaseShare of feeDeliverable
Schematic design (SD)15% – 20%Approved layout, outline spec, ROM pricing set
Design development (DD)20% – 25%Coordinated plans, ceiling, finishes, MEP systems selected
Construction documents / permit set (CD)35% – 40%Sealed, coordinated permit and bid set
Bidding, permitting & construction administration10% – 20%Plan-check responses, bid leveling, RFIs, submittals, punch list

Source: Meade Design 2025–2026 U.S. fit-out benchmarks; phase splits follow common AIA B101-based practice.

Plan check & comment resolution

  1. Pre-submittal check. We run the set against the jurisdiction’s adopted code edition, local amendments and submittal checklist before it goes in.
  2. Submittal. Architectural, MEP and fire-protection packages, with energy-compliance forms and any health-department set for food service.
  3. Comment response. Each plan-check comment gets a written response keyed to a revised sheet and a revision cloud — no ambiguity for the reviewer.
  4. Resubmittal & issuance. Most TI permits clear in one or two rounds when the code summary is complete on day one.

Why the code summary sheet matters most

Most first-round rejections trace back to an incomplete G/A000: a missing occupant-load calculation, an unclear egress path, or no plumbing fixture count. A complete code sheet is the single best predictor of a fast permit.

Have a suite under LOI?

Send the floor plan and the work letter. We will tell you what fits, what it costs and what the allowance leaves uncovered.

Request a Test Fit