Office & workplace tenant improvements

Offices are priced per square foot and leased per rentable square foot — the efficiency of the layout is the cost. We plan workplaces that fit the headcount on fewer feet.

Open office floor with upholstered phone booths, carpet tile and glass meeting rooms

2026 office fit-out cost by workplace type

Workplace typeBaselineMediumHigh
Open & agile$255$275$310
High spatial variety$275$295$340
Structured / traditional$285$310$355

Source: JLL 2026 U.S. & Canada Office Fit-Out Cost Guide, $/SF. National medium-quality average ≈ $295/SF; full market range $170–$425/SF.

Mechanical and electrical work makes up 29%–37% of office fit-out cost, builders’ works about 29%, and furniture, AV, technology and security roughly 10%–12%. That is why enclosed, structured plans cost more: every private office adds a supply diffuser, a return, a thermostat zone and lighting controls.

RSF vs. USF: where efficiency hides

Office rent and most TI allowances are quoted on rentable square feet, which include your share of lobbies, corridors and restrooms under ANSI/BOMA Z65.1. Construction happens only in usable square feet: RSF = USF × (1 + load factor).

Worked example

An 8,000 USF suite at a 15% load factor is 9,200 RSF. A $50/SF allowance on RSF is $460,000; on USF it is $400,000. The same building’s next suite at a 20% load factor would charge rent on 9,600 RSF for the same usable floor.

A test fit converts that ratio into people: two suites with identical RSF can differ by 10–15% in workstations once column grids, window mullion spacing and core depth are drawn.

Planning a hybrid workplace

  • Seat ratios. Hybrid offices commonly plan 0.6–0.8 assigned or bookable seats per employee, with peak-day attendance — not headcount — setting the count.
  • Meeting mix. Two-to-four-person rooms and phone booths are in short supply in most second-generation suites; large boardrooms are over-supplied.
  • Acoustic zoning. Put focus work away from the pantry and reception, specify ceiling attenuation and full-height partitions where privacy matters, and budget for sound masking in open areas.
  • Reuse. In second-generation space, keeping existing private offices along the window line and opening the interior is often the cheapest reconfiguration.

Price an office build-out on RSF and USF, with the allowance gap.

TI budget calculator

Have a suite under LOI?

Send the floor plan and the work letter. We will tell you what fits, what it costs and what the allowance leaves uncovered.

Request a Test Fit